We run out of Edina, about 10 miles south of Crystal, and we don't keep a branch or a standing crew in town, so a same-day arrival isn't something we promise - it's something we schedule around. A straightforward opener swap, once we're on site with the right unit, usually doesn't keep a door down long; the bigger variable is getting a tech out there with the correct opener for a header that may not match a standard new-construction spec. If the part needed is unusual - an older chain-drive logic board, for instance - that lead time sits with the supplier, not with us, and we'll tell you straight if that's the case rather than guess at a date.